This design & construct project with SINSW & school representatives was in a very tight part of the site, with access being via the adjoining council land only accessible if the grounds were dry. With limited access & tight construction zone this was a challenging build, with the 1st floor linkway joining 2 building approximately 30m apart. The majority of works were constructed through main entry linking all buildings.

Works Included:

  • Demolition
  • Excavation
  • Screw piles
  • Formwork & concrete lift shaft
  • Re-divert underground main services
  • Brickwork
  • Lift installation
  • Scaffolding internal & external
  • Carpentry
  • Metal roofing & cladding
  • Access control
  • Joinery
  • Carpet & vinyl installation

‍

‍