About UsServicesProjects
Request a quoteContact Us

PROJECTS

Colo High School

New Construction
Integration AS1428
Internal Refurbishment
Painting
Civil Works

This design & construct project with SINSW & school representatives was in a very tight part of the site, only accessible if the grounds were dry.

With limited access & tight construction zones this was a challenging build.

The 3 external lifts were built in the main thoroughfare for all buildings.

The majority of works were constructed through main entry linking all buildings.

Works Included:

  • Demolition
  • Excavation
  • Screw piles
  • Formwork & concrete lift shaft
  • Re-divert underground main services
  • Brickwork
  • Lift installation
  • Scaffolding internal & external
  • Carpentry
  • Metal roofing & cladding
  • Access control
  • Joinery
  • Carpet & vinyl installation

‍

‍

No items found.
About UsServicesProjects
© 2024 Adonis Pty Ltd. All rights reserved.
Privacy Policy