Although having both access & working hour constraints on this site, Adonis Building was able to achieve exceptional results - building an additional structure constructed to suit the existing surrounding buildings with minimal impact. All works were constructed through a main through-fare linking all buildings.

Works Included:

  • Demolition
  • Excavation
  • Formwork & concrete lift shaft
  • Re-divert underground main services
  • Brickwork
  • Lift installation
  • Scaffolding internal & external
  • Carpentry
  • Metal roofing
  • Wall & floor tiling
  • Access control
  • Joinery
  • Carpet & vinyl installation

‍