Glenvale SSP

New Construction
Integration AS1428
Groundworks/Landscaping

Partnering with the school & SINSW, we transformed a tired unkept area of the school into a new safe environment for the staff & students to enjoy.

Works Included:

  • Removing existing uneven softfall
  • Remove existing Trees & Tree Roots
  • Remove selected play equipment
  • Realign existing perimeter fencing
  • Supply & Install curved treated pine Retaining wall
  • Supply & Install new softfall in 3 stages to suit the schools operations
  • Supply & Install Fire rated Shade Structure to play ground area

‍

No items found.