NBSC Balgowlah Campus

Integration AS1428
New Construction
Groundworks/Landscaping
Painting
Civil Works

This project was completed under a GC21 Contract administered by NSWPW, in consultation with SINSW, school representatives & Adonis Building.

With limited access & tight construction zones spread across the whole school site, this was a challenging build. With the curved 1st floor linkway joining the administration block to the rest of the school buildings approximately 30m apart, which was constructed above the main entry to the school which could only be closed off for 48hrs at a time, making time management critical.

Project planning, programming and continued consultation with school representatives, NSWPW Rep & SINSW  were paramount in this project.

Works Included:

  • Demolition
  • Excavation
  • Formwork & concrete lift shaft
  • Re-divert underground main services
  • Brickwork
  • Lift installation
  • Scaffolding internal & external
  • Carpentry
  • Metal roofing
  • Vitra panel Installation
  • Access control
  • Joinery
  • Carpet & vinyl installation